Product Details:
|
|
Place of Origin: | Chuzhou China |
---|---|
Brand Name: | Chuzhou HH non-woven |
Certification: | CE |
Model Number: | HHM - SS SSS |
Payment & Shipping Terms:
|
|
Minimum Order Quantity: | 1 set |
Price: | negotiable |
Packaging Details: | components wood box packaged , machine wrapping with PE film keep cargo safe |
Delivery Time: | For detailed talk |
Payment Terms: | L/C, T/T |
Supply Ability: | For detailed talk |
Detail Information |
|||
Product: | SSS SMS SMMS Non Woven Fabric Making Machine | Usage: | Adult & Child Diaper ,medical , Hygiene ,home Use , Farms ,bags |
---|---|---|---|
Annual Output: | 1000 - 15000 Ton | Power Consumption: | 800 - 1400 KW *H / Ton |
Weight: | 60 - 200 Ton | Technical: | Spunbond And Meltblown Hot Air Drawing |
Supply Ability: | 40 Line Annual | Port: | Nanjing Or Shanghai |
High Light: | Diaper Non Woven Fabric Making Machine,SS Non Woven Fabric Making Machine,SMS Non Woven Fabric Making Machine |
Product Description
1600mm 2400mm 3200mm S SS SSS SMS SMMS non woven fabric making machine
Sss nonwoven fabric
SSS Nonwoven Fabric | ||||||||
Item |
G/m2 specification |
15 | 30 | 45 | 60 | 90 | 120 | |
Allowable deviation(%) | First class | ±8 | ±7 | |||||
Final product | ±10 | ±9 | ||||||
Width deviation (%) | First class | +2.0 ,-1.0 | +2.0 ,-1.0 | |||||
Final product | +2.5 ,-1.5 | +2.5 ,-1.5 | ||||||
Fracture strength |
MD N/5cm | First class | 15 | 35 | 50 | 68 | 95 | 130 |
Final product | 12 | 30 | 45 | 65 | 91 | 108 | ||
CD N/5cm | First class | 10 | 28 | 44 | 64 | 82 | 95 | |
Final product | 8 | 25 | 38 | 57 | 57 | 90 |
S Model (Packaging , Agricultural Cover )
Working width | Fabric | Consumption | Annual output/Year |
1600mm | 9-250G/㎡ | 130KW | 1800T |
2400mm | 9-250G/㎡ | 180KW | 2200T |
3200mm | 9-250G/㎡ | 200KW | 3300T |
4000mm | 9-250G/㎡ | 300KW | 4400T |
4800mm | 9-250G/㎡ | 400KW | 5100T |
SS Model ( Baby Diaper ,Medical Products )
Working width | Fabric | Consumption | Annual output/Year |
1600mm | 9-120G/㎡ | 200KW | 3700T |
2400mm | 9-120G/㎡ | 2500KW | 5100T |
3200mm | 9-120G/㎡ | 200KW | 6600T |
4000mm | 9-120G/㎡ | 300KW | 8800T |
4800mm | 9-120G/㎡ | 450KW | 10000T |
M Model
Working width | Fabric | Power input | Consumption | Annual output/Year |
1600mm | 15-300G/㎡ | ≈600KVA | 3000º-3500º/Ton | 800T |
2400mm | 15-300G/㎡ | ≈800KVA | 3000º-3500º/Ton | 1100T |
3200mm | 15-300G/㎡ | ≈1000KVA | 3000º-3500º/Ton | 1500T |
SMS Model
Working width | Fabric | Power input | Consumption | Annual output/Year |
1600mm | 9-100G/㎡ | ≈800KVA | 1300º-1600º/Ton | 3200T |
2400mm | 9-100G/㎡ | ≈1250KVA | 1300º-1600º/Ton | 5100T |
3200mm | 9-100G/㎡ | ≈1600KVA | 1300º-1600º/Ton | 7000T |
4000mm | 9-100G/㎡ | ≈2000KVA | 1300º-1600º/Ton | 8700T |
4800mm | 9-100G/㎡ | ≈2250KVA | 1300º-1600º/Ton | 10500T |
Width | 1600 M |
Gsm | 9 - 120 gsm |
Output per day | 8 - 10.5 Ton |
Machine Speed | ≦ 350 m / min |
Transformer | ≈ 400 KVA |
Power Consumption | 650º - 800º / Ton |
Machine Size | 45 * 15 *12 M |
Technical Advantages
1) The whole line is well-structured and easy to operate.
2) The whole line is highly automated.
3) Control elements are of well-know make, high performance and reliable technologies.
4) The whole line are controlled by PLC and operated with touch-screen.
5) The allocation of the main frame and auxiliary equipment can be special designed and adjusted according to customers requirement.
Description Of Non-woven Machine
B.Parts of spunbonded nonwoven fabric production line:
Recycle extruder---->Main extruder---->Filter---->Metering pump---->
Monomer suction device--->Spinning box(ENKA/KASEN spinneret)---->
Quenching air chamber---->Stretching device---->Web former---->
Calender---->Winder---->Slitter
C.Spunbonded process and technical flow chart:
Additive(Recycling off-cut fabric)---->Raw material----> Melting---->
Filtering---->Measuring ---->Spinning---->Cooling---->Stretching---->
Web forming---->Calendering---->Winding----> Cutting---->Final product
D.Parts of Melt blown nonwoven fabric production line:
Main extruder---->Filter---->Metering pump---->Air heating system---->
Melt blown sprayer(ENKA sprayer)---->Web former---->Winder---->Slitter
E.Melt blown process and technical flow chart:
Raw material----> Melting---->Filtering---->Measuring ---->Air heating---->
Spraying---->Web forming---->Winding----> Cutting---->Final product
Main parts of spunbond making machine
Spinning Beam
Model:1600/2400/3200mm; Heating System:Oil/Electricity Heating; Distribution Design: big hanger type; Original:CHINA;
Extrusion Machine
Aperture:90 300kg/h 1pc;
Heating System: electricity heating; Drive Motor: Siemens; Original:CHINA;
Meltblown die head assembly
maximum temperature: 300.;
Max.output:200kg/h;
Heating zone:8tod;
Perforated length:3,350mm;
HPI:40;
1 Sets L/D=10; Number of holes:5.276;
Capillary diameter:0.3mm;
Capillary length:3,600mm;
Automatic Winding Machine
Effective width:1600/2400/3200 mm Rolling Speed:200-400M/Minute Rolling Diameter:2000 mm Original: CHINA
Production Line Control Cabinet
Voltage: 380 V/3 Phase; Touch Screen:Siemens; PLC: Siemens; Frequency:Siemens; Indicator: RKC,JAPAN; Original:CHINA;
Precisely CNC center hold machining parts beyond customer require.
Exhibition Show with customer
Packaging Details
Main machine parts will be packed with wooden cases.Electrical parts will be packed with plastic and then packed into wooden cases.For the steel structure they will be packed in bulk into containers.
FAQ
1. Q:How long will your engineer reach our factory?
A:Within one week after everything ready (machine arrival your factory, non woven material, power source, air compressor etc.Prepared)
2. Q:Does your engineer understand English?
A:Our engineers understand a little English. All our engineers have more than five years machine installation experience.
3. Q:What should we charge for your engineer?
A:You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 800CNY one day per person.
4. Q:How many days it will take for the intallation?
A: It will take around 45 days, depends on the machine type.
5. Q:How do we solve the machine problem after your engineer leaving?
A:Generally speaking, there will be no problem after finishing installation. In case you have any problem, you can contact our sales at any time. Our engineers will take a solution video according your description.
Enter Your Message