Send Message
China PP Spunbond Nonwoven Production Line manufacturer

High Speed Meltblown Fabric Production Line 300gsm 500KW

Product Details:
Place of Origin: Chuzhou China
Brand Name: Chuzhou HH non-woven
Certification: CE
Model Number: HH Meltblown
Payment & Shipping Terms:
Minimum Order Quantity: 1 set
Price: negotiable
Packaging Details: components wood box packaged , machine wrapping with PE film keep cargo safe
Delivery Time: 90 - 150 days
Payment Terms: L/C, T/T
Supply Ability: 3 line / months

Detail Information

Cargo Item: Meltblown Fabric Production Line Performance: Sufficient Electret Treatment
Power: 500 KW Consumption: 250 KW / H
Gsm: 300 G Service: Engineer Over Sea Or Video On Line
Dimension: To Be Defined Inspection: Provide
High Light:

300gsm Meltblown Fabric Production Line

,

500KW Meltblown Fabric Production Line

,

300gsm pp melt blown filter machine

Product Description

newest design German technical China price meltblown fabric production line

 

 

What is the total electric energy it consumes at the same time?
About 500kW, the average power consumption is 250KW / h.
How many workers are needed per shift?
Three
How many hours does this machine run in a day?
The production line must operate 24 hours a day, because each setup requires a minimum of. Heating time of 2 hours. More importantly, each start and stop process consumes some water.
Is the installation and commissioning of the machine supported by your engineers?
Yes, but the installation fee is borne by you, including accommodation, board, transportation and pocket money.
How many spinners are there in the die? What is the distance between the centers of spinnerets?
We use a spinneret hole with a diameter of 0.25 mm, 2500 holes, and the distance between the two holes is 0.55 mm.
How to install the spinneret?
Installation: pre tighten the cleaned spinneret and spinneret with bolts. Check the gap between the spinneret and the spinneret with a feeler gauge. The general clearance is adjusted to 0.8-1.2mm; Tighten the bolts during adjustment. Finally, adjust the gap between the air knife and the spinnerets on both sides to one, and lock all bolts. Replace the filter screen and sealing ring. The spinneret assembly is installed on the die.

 

 

Description Melt blown machine raw material

 

Raw materials pp polypropylene Melting point 166℃
Spunbond pp melt index 28-45 Denier of spunbond fiber 1.8-2.5 denier
Meltblown pp melt index 1300-1800 Denier of melt blown fiber 1.6-4 microns

 

 

High Speed Meltblown Fabric Production Line 300gsm 500KW 0

 

High Speed Meltblown Fabric Production Line 300gsm 500KW 1

 

 

Technical Parameters

Model HHM-1.6m HHM-2.4M HHM-3.2M
Effective Width 1.6 M 2.4 M 3.2 M
Weight Range 18-300 G/㎡ 18-300 G/㎡ 18-300 G/㎡
Out put day 2-3 Ton 3-4 Ton 4.5-5 Ton
Machine Speed ≦70 m/min ≦70 m/min ≦70 m/min
Power Consumption 3000º-3500º/Ton 3000º-3500º/Ton 3000º-3500º/Ton
Machine Size(L*W*H) 18M*10M*10M 18M*11M*10M 18M*13M*10M

 

 

Meltblown Making Machine Series

Model

Product Width

(mm)

GSM Range

( g / ㎡ )

Capacity

(kg /day )

Melt blown

(BFE&PFE)

HHM- 1600 1600 15 - 300 200 - 300

BFE 99+

PFE 95+

HHM - 2400 2400 300 - 400
HHM - 3200 3200 450 - 500

 

 

 

Meltblown non-woven fabric production line components:
 
Screw extruder---->filter---->metering pump---->heating system---->melt blown box (Kasen)---->netting machine---- >Rewind
 
 Meltblown production process flow chart:
 
Raw Material----> Melt Extrusion----> Filtration----> Metering----> Air Heating Compression----> Melt Blown----> Web Formation----> Winding

 

High Speed Meltblown Fabric Production Line 300gsm 500KW 2

 

 

Meltblown non-woven fabric production line components:

 

 

Screw extruder---->filter---->metering pump---->heating system---->melt blown box (Kasen)---->netting machine---- >Rewind

 

 

(1) Receiving networked device:

Line speed: up to 50m/min

Meltblown receiving adjustment range: 200mm

Installation form: It can be moved horizontally, which is convenient for installation, debugging and maintenance

Driving rate: 1.1KW

(2) Suction net fan:

Power: 75KW,

4. Hot air heating system

(1) Atlas air compressor

Boost pressure: 0.7MPa

Power: 120KW~200KW

(2) Air heater

Heating power: 220KW-240KW

Material of tank and pipeline: stainless steel 304

Insulation form: stainless steel seal outside the insulation layer

5. Electret system.

6. Rack platform device:

Steel structure, easy to disassemble, firm and reliable, including stairs, etc.

7. Die head heating power: about 70kw

8. Electrical control box

 

High Speed Meltblown Fabric Production Line 300gsm 500KW 3

 

 

High Speed Meltblown Fabric Production Line 300gsm 500KW 4

 

 

 

High Speed Meltblown Fabric Production Line 300gsm 500KW 5

 

 

High Speed Meltblown Fabric Production Line 300gsm 500KW 6

 

 

High Speed Meltblown Fabric Production Line 300gsm 500KW 7

 

 

High Speed Meltblown Fabric Production Line 300gsm 500KW 8

 

 

High precisely CNC center

 

High Speed Meltblown Fabric Production Line 300gsm 500KW 9

 

 

 

 

High Speed Meltblown Fabric Production Line 300gsm 500KW 10

 

 

Exhibition Show

 

High Speed Meltblown Fabric Production Line 300gsm 500KW 11

 

High Speed Meltblown Fabric Production Line 300gsm 500KW 12

 

Packing & shipping

 

Main machine parts will be packed with wooden cases.Electrical parts will be packed with plastic and then packed into wooden cases.For the steel structure they will be packed in bulk into containers.

 

High Speed Meltblown Fabric Production Line 300gsm 500KW 13

 

 

High Speed Meltblown Fabric Production Line 300gsm 500KW 14

 

FAQ

 

1.Q : Are you a factory or trading company ?

A : We are established in 2009 , has been in onwoven industry for more than ten years .

2.Q: Do you have technical support?

A: yes , we will provide on-site installation service.

3 Q : How does your factory do regarding quality control ?

A: Quality is the most important principle . we always attach great importane to quality controlling from the very beginnging to the very end , our factory has passed CE and ISO certification .

4 Q :How long is you machine’s warrant period .

A : bascily one year warranty , long time service support .

 

 

Get in touch with us

Enter Your Message

You Might Be Into These